Prepare for receiving.

Agree the delivery and discrepancy process before the order is dispatched. These notes help you organise the conversation; the order terms determine the actual process.

Plain material sample cartons and stacked tile
Illustrative material study.

Confirm the arrangements.

Provide the complete destination, site contact and access information. Say if there are restrictions on vehicle access, unloading, receiving hours or storage. Ask what the delivery quote includes rather than assuming unloading or installation is included.

For a phased or multi-location order, keep a separate receiving reference for each delivery.

Download the receiving record

BEFORE THE DELIVERY

Have the agreed list ready.

  • Keep the order confirmation, approved item schedule and delivery reference available.
  • Confirm the site contact, access arrangements and receiving location.
  • Ask what unloading help or equipment is required and who arranges it.
  • Confirm any agreed documentation and how discrepancies should be reported.
  • Ask for the relevant product handling and storage instructions.

AT RECEIPT

Record what actually arrived.

Receiving notes
CheckRecord
Delivery referenceDate, order/delivery reference and location.
Packages & itemsVisible carton/pallet count; item references where accessible.
ConditionVisible damage or discrepancy, with clear photos and package labels.
Quantity differencesWhat was expected and what was received, using the same unit.
Follow-upWho was notified, when, and the agreed next action.

Use the reporting procedure and timing agreed for the order. Keep packaging and related documents as appropriate for the claim process. Do not assume a website checklist changes the carrier or sale terms.

BEFORE INSTALLATION OR USE

Resolve discrepancies first.

Check the supplied item against the approved selection and follow the relevant manufacturer instructions. If the reference, finish, size, quantity or condition appears different, raise it promptly through the agreed contact before proceeding.

Where there is a suitability or installation question, refer it to the qualified person responsible for the work. Retain the delivery record with the purchase documents.