LANA / MATERIALS & PROJECT BUYINGSPECIFICATIONS · QUANTITIES · DELIVERY

BUYING GUIDE / 01

From first list to agreed order.

Use these notes to organise a purchase enquiry. Product choices and project requirements still need confirmation for the actual job.

01 / SCOPE

Start with the room or job.

Describe the work: a single room, a whole property, repeat units or a purchase in stages. Group the material list around that scope. If you already have a drawing, schedule or bill of quantities, keep its item references in your enquiry.

Separate replacement items that must match existing materials from new selections. Include related pieces such as trim, transitions, handles and closure panels. This helps keep the quote tied to the actual requirement.

02 / QUANTITIES

Make the unit visible.

“Twenty” is not enough without a unit. State pieces, cartons, square feet, square metres or linear feet beside the quantity. Include dimensions where they determine what is being supplied.

For repeat rooms, record quantity per room and project total. Ask how the quotation handles packs or cartons and any minimum quantity. Have the installer confirm measurements, cutting allowances and suitability; no automatic waste percentage is assumed here.

03 / ALTERNATIVES

Write down what can change.

Alternative-product decision record
RecordQuestion to resolve
Original itemWhich product/reference is being replaced?
Proposed itemWhat is the exact alternative?
DifferencesDimensions, material, finish, performance information, price or timing?
Related itemsDoes the change affect trim, fittings, quantities or adjoining finishes?
ApprovalWho reviewed it and which version of the list was approved?

Mark an alternative as a proposal until accepted. A similar appearance does not establish identical fit, performance or documentation.

04 / DOCUMENTS

Ask for the right product information.

Tell us what your project requires, such as a current product sheet, care instructions, dimensional drawing or product-specific supporting documentation. Confirm availability for the exact item, rather than assuming the whole category has the same attributes.

Keep the document reference with the selected product. Project code, design and installation requirements belong with the qualified people responsible for the work; a supplier website cannot establish those requirements for an unspecified product.

05 / ORDER SIGN-OFF

Review the final list, not just the total.

  • Product references, versions, sizes, finishes and accepted alternatives.
  • Quantity, unit, case or pack basis and any minimums.
  • Price, currency, taxes, freight and other included or excluded charges.
  • Payment schedule, quotation validity and order confirmation process.
  • Requested versus confirmed lead times and delivery arrangements.
  • Documents required for the selected products.
  • Change, cancellation, return and damage-reporting terms.

Save the approved schedule and written quotation together. Preparing an enquiry on this website does not place an order.

06 / CHANGES

Use the same item references.

When something changes after a quote, identify the affected item and the requested change. Check the effect on other components, quantities, pricing and timing before approving the revised list.

Keep the latest accepted version clear, especially when several people or locations are involved. Ask about applicable cancellation and return terms before committing to special-order or made-to-size items.

Prepare a materials enquiry